Whether the Taylors established a right of way by prescription.
Holding
No. The evidence did not show the required fifteen years of open, continuous, uninterrupted, and adverse use under a claim of right.
Reasoning
A prescriptive easement in Kentucky requires use of another's land that is open, peaceable, continuous, adverse, and under a claim of right, with the landowner's knowledge and acquiescence, for at least fifteen years.
The road's use before 1965 was permissive. The Holbrooks authorized the coal-haul road, received royalties for that use, and later used the road in connection with their own tenant house. Permission defeats the adversity required for prescription.
The record also did not provide probative evidence that the earlier use was continuous and uninterrupted for the statutory period. The trial court therefore properly declined to recognize a prescriptive easement.